• <tr id='dwQSu3'><strong id='dwQSu3'></strong><small id='dwQSu3'></small><button id='dwQSu3'></button><li id='dwQSu3'><noscript id='dwQSu3'><big id='dwQSu3'></big><dt id='dwQSu3'></dt></noscript></li></tr><ol id='dwQSu3'><option id='dwQSu3'><table id='dwQSu3'><blockquote id='dwQSu3'><tbody id='dwQSu3'></tbody></blockquote></table></option></ol><u id='dwQSu3'></u><kbd id='dwQSu3'><kbd id='dwQSu3'></kbd></kbd>

    <code id='dwQSu3'><strong id='dwQSu3'></strong></code>

    <fieldset id='dwQSu3'></fieldset>
          <span id='dwQSu3'></span>

              <ins id='dwQSu3'></ins>
              <acronym id='dwQSu3'><em id='dwQSu3'></em><td id='dwQSu3'><div id='dwQSu3'></div></td></acronym><address id='dwQSu3'><big id='dwQSu3'><big id='dwQSu3'></big><legend id='dwQSu3'></legend></big></address>

              <i id='dwQSu3'><div id='dwQSu3'><ins id='dwQSu3'></ins></div></i>
              <i id='dwQSu3'></i>
            1. <dl id='dwQSu3'></dl>
              1. <blockquote id='dwQSu3'><q id='dwQSu3'><noscript id='dwQSu3'></noscript><dt id='dwQSu3'></dt></q></blockquote><noframes id='dwQSu3'><i id='dwQSu3'></i>
                首页 > 新闻中心 > 工程动态
                三公司常州地铁施工进入新阶段
                来源:三公司 作者:霍亮亮 发布时间:2019-11-15 浏览次数:654  字体:【 【打印】
                   11月13日,随着K922型钢轨焊机的缓慢开动,三公司常州地铁项目第一个钢轨接头顺利完成,标志着该项目施工进入新里程。该项目无缝线路施工采用现阶段最先进的焊接技术——K922型钢轨焊机闪光接触焊。
                分享到:
                0
                  | |  
                上一篇:南宁地铁5号线02标6工区项目部荣获指挥部11月份劳动竞赛考核第一名
                下一篇:遵余高速公路6标成功浇筑首片梁
                中铁广州工程局集团版权所有  备案号:粤ICP备19143791号